170301-N-XN518-012
SAN DIEGO-- Sailors turn in their hardhats onboard Wasp-class amphibious assault ship USS Essex (LHD2). Essex is nearing the end of a Planned Maintenance Availability (PMA) period, where they received upgrades to their flight deck and other systems to support the upcoming addition of the F-35 Joint Strike Fighter. (U.S. Navy Photo by Mass Communication Specialist 2nd Class Irwin D. Sampaga/released)
| Date Taken: | 03.01.2017 |
| Date Posted: | 03.07.2017 00:21 |
| Photo ID: | 3208784 |
| VIRIN: | 170301-N-XN518-012 |
| Resolution: | 3602x2573 |
| Size: | 447.05 KB |
| Location: | USS ESSEX (LHD 2), CA |
| Web Views: | 39 |
| Downloads: | 43 |
This work, Planned Maintenance Availability [Image 537 of 537], by Irwin Philip D Sampaga, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
No keywords found.

