(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    FOB Hadrian Deconstruction on Schedule [Image 11 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A forward operating base or staging area in an arid, mountainous environment showing multiple tan/desert-camouflaged military vehicles parked in a gravel lot. The vehicles include MRAPs (Mine-Resistant Ambush Protected vehicles) and what appears to be a heavy recovery or wrecker vehicle with an extended crane arm. A US flag is visible on the left side, and military tents are visible in the background.

    DEH RAWUD, AFGHANISTAN

    05.30.2013

    Photo by OR-6 Mark Doran 

    Combined Team Uruzgan

    United States Army equipment and facilities are at Forward Operating Base Hadrian, which will be the last coalition base to be deconstructed in Uruzgan.

    IMAGE INFO

    Date Taken: 05.30.2013
    Date Posted: 06.04.2013 11:57
    Photo ID: 946110
    VIRIN: 130530-A-MD709-091
    Resolution: 3600x2400
    Size: 1.04 MB
    Location: DEH RAWUD, AF

    Web Views: 172
    Downloads: 11

    PUBLIC DOMAIN