United States Army facilities and a mine resistant ambush protected vehicle are at Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.
| Date Taken: | 05.30.2013 |
| Date Posted: | 06.04.2013 11:58 |
| Photo ID: | 946109 |
| VIRIN: | 130530-A-MD709-090 |
| Resolution: | 3600x2400 |
| Size: | 1.25 MB |
| Location: | DEH RAWUD, AF |
| Web Views: | 155 |
| Downloads: | 12 |
This work, FOB Hadrian Deconstruction on Schedule [Image 11 of 11], by OR-5 Mark Doran, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.