(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    FOB Hadrian Deconstruction on Schedule [Image 8 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Four military personnel in camouflage uniforms are gathered in an outdoor gym area covered by a camouflage netting canopy. The facility appears to be a forward operating base fitness area set up in an arid desert environment. Weight training equipment including barbells, weight plates, and exercise machines are arranged on a stone-paved surface.

    DEH RAWUD, AFGHANISTAN

    05.30.2013

    Photo by OR-6 Mark Doran 

    Combined Team Uruzgan

    Col. Simon Stuart, Commander Combined Team Uruzgan (CTU), inspects the gym at Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.

    IMAGE INFO

    Date Taken: 05.30.2013
    Date Posted: 06.04.2013 11:59
    Photo ID: 946107
    VIRIN: 130530-A-MD709-088
    Resolution: 2400x3600
    Size: 1.13 MB
    Location: DEH RAWUD, AF

    Web Views: 138
    Downloads: 7

    PUBLIC DOMAIN