(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    FOB Hadrian Deconstruction on Schedule [Image 4 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows four U.S. Army soldiers in a fortified position, likely a guard post or fighting position, wearing MultiCam (OCP) camouflage uniforms and body armor. They appear to be in a desert environment, with ammunition cans, a mounted weapon, and camouflage netting visible. At least one soldier is identified by a name tape reading 'ERWIN' and unit patches consistent with the 3rd Infantry Division are visible.

    DEH RAWUD, AFGHANISTAN

    05.30.2013

    Photo by OR-6 Mark Doran 

    Combined Team Uruzgan

    Col. Simon Stuart, commander Combined Team Uruzgan,(Centre) and Capt. Johnothan W. Erwin, commander Bravo Battery, 1st Battalion, 9th Field Artillery, 2nd Armored Brigade Combat Team inspect the security at Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.

    IMAGE INFO

    Date Taken: 05.30.2013
    Date Posted: 06.04.2013 12:17
    Photo ID: 946103
    VIRIN: 130530-A-MD709-052
    Resolution: 3600x2400
    Size: 1.2 MB
    Location: DEH RAWUD, AF

    Web Views: 130
    Downloads: 8

    PUBLIC DOMAIN