(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    FOB Hadrian Deconstruction on Schedule [Image 5 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Two military personnel are positioned inside what appears to be a fortified observation post or guard tower with wooden construction. One soldier wears Australian Defence Force (ADF) Disruptive Pattern Camouflage Uniform (DPCU) with a bush hat, while the other wears MultiCam/OCP pattern consistent with US Army uniform. They appear to be at a shared workstation with weapons and communications equipment.

    DEH RAWUD, AFGHANISTAN

    05.30.2013

    Photo by OR-6 Mark Doran 

    Combined Team Uruzgan

    (Left) Col. Simon Stuart, commander Combined Team Uruzgan,(Centre) inspects the security at Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.

    IMAGE INFO

    Date Taken: 05.30.2013
    Date Posted: 06.04.2013 12:17
    Photo ID: 946104
    VIRIN: 130530-A-MD709-058
    Resolution: 3600x2400
    Size: 1.21 MB
    Location: DEH RAWUD, AF

    Web Views: 111
    Downloads: 8

    PUBLIC DOMAIN