Col. Simon Stuart, Commander Combined Team Uruzgan (CTU), inspects the gym at Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.
| Date Taken: | 05.30.2013 |
| Date Posted: | 06.04.2013 12:00 |
| Photo ID: | 946106 |
| VIRIN: | 130530-A-MD709-082 |
| Resolution: | 2400x3600 |
| Size: | 981.82 KB |
| Location: | DEH RAWUD, AF |
| Web Views: | 130 |
| Downloads: | 7 |
This work, FOB Hadrian Deconstruction on Schedule [Image 11 of 11], by OR-5 Mark Doran, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.