(Right-left) Capt. Johnothan W. Erwin, commander Bravo Battery,1st Battalion, 9th Field Artillery, 2nd Armored Brigade Combat Team briefs the Col. Simon Stuart, commander Combined Team Uruzgan, on the progress of the deconstruction of Forward Operating Base Hadrian.
| Date Taken: | 05.30.2013 |
| Date Posted: | 06.04.2013 12:15 |
| Photo ID: | 946101 |
| VIRIN: | 130530-A-MD709-041 |
| Resolution: | 3600x2400 |
| Size: | 965.11 KB |
| Location: | DEH RAWUD, AF |
| Web Views: | 125 |
| Downloads: | 7 |
This work, FOB Hadrian Deconstruction on Schedule [Image 11 of 11], by OR-5 Mark Doran, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.