(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    FOB Hadrian Deconstruction on Schedule [Image 6 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Three military personnel in camouflage uniforms are walking across a arid, gravel-covered terrain that appears to be a forward operating base or military installation. The soldier on the left wears US Army MultiCam (OCP) pattern uniform, while the two on the right wear Australian AUSCAM (DPCU) pattern uniforms. The background features desert mountains, HESCO barrier walls, a guard tower, and what appears to be an Afghan flag.

    DEH RAWUD, AFGHANISTAN

    05.30.2013

    Photo by OR-6 Mark Doran 

    Combined Team Uruzgan

    (From left) Capt. Johnothan W. Erwin, Commander Bravo Battery,1st Battalion, 9th Field Artillery, 2nd Armored Brigade Combat Team, Colonel Simon Stuart, Commander Combined Team Uruzgan (CTU), and Warrant Officer Class One Paul Tyrell, Regimental Sergeant Major CTU, inspect Forward Operating Base Hadrian which will be the last coalition base to be deconstructed in Uruzgan.

    IMAGE INFO

    Date Taken: 05.30.2013
    Date Posted: 06.04.2013 12:01
    Photo ID: 946105
    VIRIN: 130530-A-MD709-079
    Resolution: 3600x2400
    Size: 1.16 MB
    Location: DEH RAWUD, AF

    Web Views: 157
    Downloads: 8

    PUBLIC DOMAIN