(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    FOB Hadrian Deconstruction on Schedule [Image 3 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Several military personnel in camouflage uniforms are gathered inside a military command tent or operations center. The soldiers appear to be engaged in a briefing or discussion, with one soldier on the right actively speaking. Visible patches include ISAF (International Security Assistance Force) insignia, suggesting an Afghanistan-era operational context.

    DEH RAWUD, AFGHANISTAN

    05.30.2013

    Photo by OR-6 Mark Doran 

    Combined Team Uruzgan

    (Rightto left) Major Carl P. Lockett, Security Forces Advisory Team (SFAT) 5K Commander, 56th Infantry Brigade Combat Team, out of the Texas National Guard, briefs Lt. Col. William E. Phillips SFAT commander, Captain Johnothan W. Erwin, commander Bravo Battery,1st Battalion, 9th Field Artillery and Col. Simon Stuart, commander Combined Team Uruzgan, on the progress of the deconstruction of Forward Operating Base Hadrian.

    IMAGE INFO

    Date Taken: 05.30.2013
    Date Posted: 06.04.2013 12:16
    Photo ID: 946102
    VIRIN: 130530-A-MD709-047
    Resolution: 3600x2400
    Size: 957.22 KB
    Location: DEH RAWUD, AF

    Web Views: 203
    Downloads: 7

    PUBLIC DOMAIN