(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 8 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    06.02.2026

    Photo by Jhewel-Georlyn Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    U.S. Navy Senior Chief Christopher Farmer, right, master diver for Construction Dive Detachment 2-4, Underwater Construction Team TWO, conducts a post-dive safety assessment with CM2 Tyler Huntoon following underwater operations in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. Divers and topside personnel routinely communicate and assess diver condition following each dive to help ensure safe operations. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 06.02.2026
    Date Posted: 06.11.2026 14:00
    Photo ID: 9743639
    VIRIN: 260602-N-HT002-1008
    Resolution: 7008x4672
    Size: 7.67 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 5
    Downloads: 0

    PUBLIC DOMAIN