A Seabee diver assigned to Construction Dive Detachment 2-4, Underwater Construction Team TWO, enters the water to begin underwater operations in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. The team supported construction efforts below the waterline by conducting underwater cleaning, excavation and sediment removal operations. (U.S. Navy photo by Jhewel Felipe)
| Date Taken: | 06.02.2026 |
| Date Posted: | 06.11.2026 14:00 |
| Photo ID: | 9743520 |
| VIRIN: | 260602-N-HT002-1001 |
| Resolution: | 6207x4138 |
| Size: | 3.56 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 9 |
| Downloads: | 0 |
This work, Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 10 of 10], by Jhewel-Georlyn Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.