(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 1 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    06.02.2026

    Photo by Jhewel-Georlyn Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    A Seabee diver assigned to Construction Dive Detachment 2-4, Underwater Construction Team TWO, enters the water to begin underwater operations in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. The team supported construction efforts below the waterline by conducting underwater cleaning, excavation and sediment removal operations. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 06.02.2026
    Date Posted: 06.11.2026 14:00
    Photo ID: 9743520
    VIRIN: 260602-N-HT002-1001
    Resolution: 6207x4138
    Size: 3.56 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 9
    Downloads: 0

    PUBLIC DOMAIN