(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 4 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    06.02.2026

    Photo by Jhewel-Georlyn Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    Members of Construction Dive Detachment 2-4, Underwater Construction Team TWO, prepare diving equipment before entering the water in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. Thorough equipment inspections and safety checks help ensure divers are prepared to execute underwater construction tasks supporting construction of the future Dry Dock 5. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 06.02.2026
    Date Posted: 06.11.2026 14:00
    Photo ID: 9743593
    VIRIN: 260602-N-HT002-1004
    Resolution: 7008x4672
    Size: 8.21 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 3
    Downloads: 0

    PUBLIC DOMAIN