Members of Construction Dive Detachment 2-4, Underwater Construction Team TWO, prepare diving equipment before entering the water in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. Thorough equipment inspections and safety checks help ensure divers are prepared to execute underwater construction tasks supporting construction of the future Dry Dock 5. (U.S. Navy photo by Jhewel Felipe)
| Date Taken: | 06.02.2026 |
| Date Posted: | 06.11.2026 14:00 |
| Photo ID: | 9743593 |
| VIRIN: | 260602-N-HT002-1004 |
| Resolution: | 7008x4672 |
| Size: | 8.21 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 10 of 10], by Jhewel-Georlyn Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.