U.S. Navy CM2 Tyler Huntoon, assigned to Construction Dive Detachment 2-4, Underwater Construction Team TWO, returns to the surface following underwater operations in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. (U.S. Navy photo by Jhewel Felipe)
| Date Taken: | 06.02.2026 |
| Date Posted: | 06.11.2026 14:00 |
| Photo ID: | 9743617 |
| VIRIN: | 260602-N-HT002-1007 |
| Resolution: | 7008x4672 |
| Size: | 9.96 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 10 of 10], by Jhewel-Georlyn Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.