(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 7 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    06.02.2026

    Photo by Jhewel-Georlyn Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    U.S. Navy CM2 Tyler Huntoon, assigned to Construction Dive Detachment 2-4, Underwater Construction Team TWO, returns to the surface following underwater operations in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 06.02.2026
    Date Posted: 06.11.2026 14:00
    Photo ID: 9743617
    VIRIN: 260602-N-HT002-1007
    Resolution: 7008x4672
    Size: 9.96 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 2
    Downloads: 0

    PUBLIC DOMAIN