(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard [Image 3 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Underwater Construction Team Supports Future Dry Dock 5 at Pearl Harbor Naval Shipyard

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    06.02.2026

    Photo by Jhewel-Georlyn Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    U.S. Navy CM1 Winston Snyder, assigned to Construction Dive Detachment 2-4, Underwater Construction Team TWO, assists BU3 Ryan Patterson in removing diving equipment following underwater operations in support of P-209, the future Dry Dock 5, at Pearl Harbor Naval Shipyard, Hawaii, June 2, 2026. Divers and topside personnel work together throughout each dive to safely execute underwater construction operations. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 06.02.2026
    Date Posted: 06.11.2026 14:00
    Photo ID: 9743554
    VIRIN: 260602-N-HT002-1003
    Resolution: 7008x4672
    Size: 7.63 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 3
    Downloads: 0

    PUBLIC DOMAIN