(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Construction Continues Around the Clock at Dry Dock 5 (P-209) [Image 4 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows a close-up of an industrial mechanical grab bucket or clamshell bucket branded 'ACS' and 'FSM', actively scooping or releasing bulk granular material such as sand, ore, or aggregate. The bucket is suspended from a crane or similar lifting mechanism inside what appears to be a large industrial facility or warehouse. Fine particles are visibly falling/spilling from the bucket, indicating active material handling operations.

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    07.09.2026

    Photo by Jhewel Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    An excavator moves construction material during overnight operations at Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, July 9, 2026. Material handling and site preparation activities supporting land reclamation for the Navy's largest military construction project. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 07.09.2026
    Date Posted: 07.13.2026 16:44
    Photo ID: 9808534
    VIRIN: 260709-N-HT002-1004
    Resolution: 7008x4672
    Size: 6.68 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 49
    Downloads: 4

    PUBLIC DOMAIN