An excavator moves construction material during overnight operations at Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, July 9, 2026. Material handling and site preparation activities supporting land reclamation for the Navy's largest military construction project. (U.S. Navy photo by Jhewel Felipe)
| Date Taken: | 07.09.2026 |
| Date Posted: | 07.13.2026 16:44 |
| Photo ID: | 9808531 |
| VIRIN: | 260709-N-HT002-1003 |
| Resolution: | 7008x4672 |
| Size: | 11.55 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 11 |
| Downloads: | 0 |
This work, Construction Continues Around the Clock at Dry Dock 5 (P-209) [Image 6 of 6], by Jhewel Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.