Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    19th MXS sheet metal repairs keep C-130J mission ready [Image 3 of 8]

    19th MXS sheet metal repairs keep C-130J mission ready

    LITTLE ROCK AIR FORCE BASE, AR, UNITED STATES

    08.31.2021

    Photo by Tech. Sgt. Zachary Kee 

    19th Airlift Wing

    Tech. Sgt. Brandon Thelen, 19th Maintenance Squadron aircraft structural craftsman, drills a rivet into a piece of equipment at Little Rock Air Force Base, Arkansas, Aug. 31, 2021. Airmen who work in the sheet metal shop conduct repairs to ensure the C-130J Super Hercules stays ready to fly anytime, anywhere. (U.S. Air Force photo by Tech. Sgt. Zachary Kee)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.31.2021
    Date Posted: 09.07.2021 15:19
    Photo ID: 6821522
    VIRIN: 210831-F-EW167-1037
    Resolution: 5413x3602
    Size: 2.61 MB
    Location: LITTLE ROCK AIR FORCE BASE, AR, US

    Web Views: 14
    Downloads: 3

    PUBLIC DOMAIN