Military veterans listen to opening comments during a Nov. 8, 2019, ceremonial groundbreaking for a Veterans Affairs Central Valley Community Based Outpatient Clinic in French Camp, California.
The U.S. Army Corps of Engineers will build the clinic that will be located next to San Joaquin General Hospital. The project includes construction of the 158,000 square foot clinic, as well as a 150,000 square foot, 120-bed Community Living Center, and an Engineering Logistics Building. All three are scheduled to be completed in 2022.
USACE has a longstanding strategic partnership with VA, since our historic assistance with major hospital construction projects after World War II. (U.S. Army photo by Ken Wright)
Date Taken: | 11.08.2019 |
Date Posted: | 11.12.2019 15:10 |
Photo ID: | 5905090 |
VIRIN: | 191108-A-PZ859-0500 |
Resolution: | 3600x2400 |
Size: | 2.07 MB |
Location: | FRENCH CAMP, CA, US |
Web Views: | 6 |
Downloads: | 3 |
This work, USACE and VA Break Ground for Outpatient Clinic [Image 14 of 14], by Kenneth Wright, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT