Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    the aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide [Image 218 of 1217]

    the aircraft carrier USS George H.W. Bush (CVN 77). GWHB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide

    USS GEORGE H.W. BUSH, N/A, UNITED STATES

    09.14.2016

    Photo by Michael B Zingaro  

    U.S. Navy           

    160914-N-KB401-144 ATLANTIC OCEAN (Sept. 14, 2016) Hull Maintenance Technician 2nd Class Christina Hearn welds a CO2 extinguisher mount onto the bulkhead in the forward pump room aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide range of mission-critical operations. (U.S. Navy photo by Mass Communication Specialist 3rd Class Michael B. Zingaro/Released)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.14.2016
    Date Posted: 09.20.2016 09:50
    Photo ID: 2863958
    VIRIN: 160914-N-KB401-144
    Resolution: 2502x1848
    Size: 1.16 MB
    Location: USS GEORGE H.W. BUSH, N/A, US

    Web Views: 4
    Downloads: 138

    PUBLIC DOMAIN