(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Kaw Dam Bridge Bearing Replacement Underway [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows a close-up view of a steel bridge bearing assembly resting on a concrete pier or abutment cap, photographed from underneath the bridge structure. Significant corrosion and rust are visible on the steel girder and bearing plates, along with deterioration of the concrete base. The background reveals a road and green vegetation, indicating this is an elevated bridge structure.

    OKLAHOMA, UNITED STATES

    08.19.2026

    Photo by Stacey Reese 

    U.S. Army Corps of Engineers, Tulsa District

    An original rocker bearing and deteriorated grout pad beneath the bridge over Kaw Dam show the extent of degradation that led to the bearing replacement project near Kaw City, Oklahoma, Aug. 20, 2026.

    All 32 original rocker bearings are being replaced with new elastomeric bearings. Elastomeric bearings have a longer life expectancy than the original rocker bearings and contain no moving metal parts, making them virtually maintenance-free, more resistant to corrosion and better able to absorb shocks and vibrations. (U.S. Army photo by Stacey Reese)

    IMAGE INFO

    Date Taken: 08.19.2026
    Date Posted: 08.25.2026 09:18
    Photo ID: 9887630
    VIRIN: 260820-A-MW145-1900
    Resolution: 6048x4032
    Size: 4.03 MB
    Location: OKLAHOMA, US

    Web Views: 8
    Downloads: 1

    PUBLIC DOMAIN