(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Kaw Dam Bridge Bearing Replacement Underway [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows an industrial or construction setting, likely underneath a bridge or heavy steel structure, where repair or maintenance work appears to be in progress. A large wooden timber beam is positioned vertically between steel structural members, possibly being used as a temporary support or shoring element. Tools and equipment are visible on a concrete surface below.

    OKLAHOMA, UNITED STATES

    08.19.2026

    Photo by Stacey Reese 

    U.S. Army Corps of Engineers, Tulsa District

    A structural support beam and hydraulic jack hold an elevated bridge span in place during bearing replacement work at Kaw Dam near Kaw City, Oklahoma, Aug. 20, 2026.

    The equipment stabilizes the span while crews remove an original rocker bearing and install a new elastomeric bearing secured with a new bolt. The work is part of a project to replace all 32 bridge bearings. Elastomeric bearings have a longer life expectancy than the original rocker bearings and contain no moving metal parts, making them virtually maintenance-free, more resistant to corrosion and better able to absorb shocks and vibrations. (U.S. Army photo by Stacey Reese)

    IMAGE INFO

    Date Taken: 08.19.2026
    Date Posted: 08.25.2026 09:19
    Photo ID: 9887623
    VIRIN: 260820-A-MW145-1897
    Resolution: 6048x4032
    Size: 2.92 MB
    Location: OKLAHOMA, US

    Web Views: 11
    Downloads: 1

    PUBLIC DOMAIN