(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    The Impossible Turnaround of Dry Dock 2 at PHNSY [Image 6 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The Impossible Turnaround of Dry Dock 2 at PHNSY

    Halau-Lani Davan, a Code 990 Temporary Services Shop electrician, left, and Danalynne Llacuna, a Code 990 Temporary Services Shop pipefitter, connect a T500 temporary services shore power electrical cable to an electrical load center at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) July 7, 2026. The Code 990 Temporary Services Shop provides critical temporary utility services—including electrical power, water, air, and steam—to Navy vessels during maintenance availabilities to ensure continuous operations and shipboard habitability. T500 shore power cables deliver electrical power from the pier or dry dock to the vessel, allowing the ship's onboard generators to be shut down for maintenance. PHNSY & IMF’s mission is to keep the Navy’s fleet “Fit to Fight" by repairing, maintaining, and modernizing the Navy's fast-attack submarines and surface ships. Strategically located in the heart of the Pacific, it is the most comprehensive fleet repair and maintenance facility between the U.S. West Coast and the Far East. (U.S. Navy photo by Justice Vannatta)

    IMAGE INFO

    Date Taken: 07.07.2026
    Date Posted: 08.13.2026 19:42
    Photo ID: 9868403
    VIRIN: 260707-N-EL904-1016
    Resolution: 6000x4000
    Size: 4.89 MB
    Location: JBPHH, HAWAII, US

    Web Views: 4
    Downloads: 0

    PUBLIC DOMAIN