(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    The Impossible Turnaround of Dry Dock 2 at PHNSY [Image 1 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The Impossible Turnaround of Dry Dock 2 at PHNSY

    PEARL HARBOR, HAWAII, UNITED STATES

    07.07.2026

    Photo by Justice Vannatta 

    Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility

    Workers perform a basin washdown of Dry Dock 2 immediately following dry dock dewatering at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF). The basin washdown is a critical maintenance step performed immediately after a vessel is undocked and the water is pumped out, clearing away marine growth, silt, and debris from the dock floor. This ensures a clean and safe working environment for the shipyard's shipwright, rigging, and engineering teams as they work quickly under tight schedules to build the next docking pattern. PHNSY & IMF’s mission is to keep the Navy’s fleet “Fit to Fight" by repairing, maintaining, and modernizing the Navy's fast-attack submarines and surface ships. Strategically located in the heart of the Pacific, it is the most comprehensive fleet repair and maintenance facility between the U.S. West Coast and the Far East. (U.S. Navy photo by Justice Vannatta)

    IMAGE INFO

    Date Taken: 07.07.2026
    Date Posted: 08.13.2026 19:42
    Photo ID: 9868375
    VIRIN: 260707-N-EL904-1001
    Resolution: 6000x4000
    Size: 6.65 MB
    Location: PEARL HARBOR, HAWAII, US
    Hometown: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 4
    Downloads: 0

    PUBLIC DOMAIN