Members of the Lower San Joaquin River project delivery team observe construction operations at Tenmile Slough Reach 30 Left Bank (TS30L) during a site visit in Stockton, California on June 26, 2026. The team viewed the installation of a bentonite slurry cut-off wall, a key feature designed to strengthen the levee and help reduce flood risk
The Tenmile Slough, Reach 30 Left Bank (TS30L) portion of the Lower San Joaquin River project includes strengthening approximately 5,900 feet of levee through a fix-in-place design that features a cut-off wall, levee geometry improvements, and waterside erosion protection. Construction is expected to be completed November 2026, helping reduce flood risk for surrounding communities. (U.S. Army photo by Bertha Angela Smith, U.S. Army Corps of Engineers Sacramento District Public Affairs)
| Date Taken: | 06.23.2026 |
| Date Posted: | 06.30.2026 19:07 |
| Photo ID: | 9784693 |
| VIRIN: | 260623-A-DX319-1139 |
| Resolution: | 6048x4024 |
| Size: | 5.29 MB |
| Location: | STOCKTON, CALIFORNIA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, 260623 TS30L Construction Site Visit w/ Col. Robert McTighe [Image 9 of 9], by Bertha Smith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.