(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    260623 TS30L Construction Site Visit w/ Col. Robert McTighe [Image 5 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    260623 TS30L Construction Site Visit w/ Col. Robert McTighe

    STOCKTON, CALIFORNIA, UNITED STATES

    06.23.2026

    Photo by Bertha Smith 

    U.S. Army Corps of Engineers, Sacramento District

    A Forsgren contractor provides an update on construction progress to members of the Lower San Joaquin River Project Delivery Team during a site visit at Tenmile Slough Reach 30 Left Bank (TS30L) in Stockton, California on June 26, 2026. The visit provided an opportunity to review ongoing levee improvements and discuss project milestones supporting long-term flood risk reduction.

    The Tenmile Slough, Reach 30 Left Bank (TS30L) portion of the Lower San Joaquin River project includes strengthening approximately 5,900 feet of levee through a fix-in-place design that features a cut-off wall, levee geometry improvements, and waterside erosion protection. Construction is expected to be completed November 2026, helping reduce flood risk for surrounding communities. (U.S. Army photo by Bertha Angela Smith, U.S. Army Corps of Engineers Sacramento District Public Affairs)

    IMAGE INFO

    Date Taken: 06.23.2026
    Date Posted: 06.30.2026 19:07
    Photo ID: 9784685
    VIRIN: 260623-A-DX319-1101
    Resolution: 6048x4024
    Size: 2.33 MB
    Location: STOCKTON, CALIFORNIA, US

    Web Views: 5
    Downloads: 0

    PUBLIC DOMAIN