Louisville District’s David Smith and Josee Scott inspect the miter gate at Green Lock and Dam 1 in Reed, Kentucky, Aug. 15, 2025.
| Date Taken: | 08.15.2025 |
| Date Posted: | 12.30.2025 08:09 |
| Photo ID: | 9463550 |
| VIRIN: | 250815-A-KX407-3587 |
| Resolution: | 6000x4000 |
| Size: | 5.94 MB |
| Location: | KENTUCKY, US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, USACE completes two-phase miter gate repair project ahead of schedule [Image 5 of 5], by Abby Korfhage, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.