JOINT BASE PEARL HARBOR-HICKAM, Hawaii (NNS) — Construction progress is marked by a key concrete pour ceremony for the Oahu Prefabricated Floor Unit (PFU), a foundation component of Dry Dock 5. This massive construction project is essential for supporting the readiness and lethality of the U.S. Navy Fleet, ensuring naval strength remains unmatched. (U.S. Navy Photo by DHO Joint Venture Released)
| Date Taken: | 07.03.2025 |
| Date Posted: | 12.17.2025 17:07 |
| Photo ID: | 9449735 |
| VIRIN: | 250314-N-QE566-9029 |
| Resolution: | 6000x4000 |
| Size: | 5.61 MB |
| Location: | US |
| Web Views: | 7 |
| Downloads: | 1 |
This work, Oahu Keel Pour [Image 26 of 26], by Corwin Colbert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.