JOINT BASE PEARL HARBOR-HICKAM, Hawaii (NNS) — Workers oversee the pouring of concrete for the Molokai Prefabricated Floor Unit (PFU), a large foundation unit being constructed for Dry Dock 5. DD5 is a critical investment designed to replace the aging Dry Dock 3 and support current and planned future classes of nuclear-powered warships. (U.S. Navy Photo by DHO Joint Venture Released)
| Date Taken: | 07.03.2025 |
| Date Posted: | 12.17.2025 17:07 |
| Photo ID: | 9449708 |
| VIRIN: | 241220-N-QE566-9020 |
| Resolution: | 6000x4000 |
| Size: | 5.06 MB |
| Location: | US |
| Web Views: | 13 |
| Downloads: | 1 |
This work, Molokai Keel Pour [Image 26 of 26], by Corwin Colbert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.