JOINT BASE PEARL HARBOR-HICKAM, Hawaii (NNS) — Construction workers execute a concrete pour for the Kauai Prefabricated Floor Unit (PFU), a major component being built for the new Dry Dock 5. Through the Shipyard Infrastructure Optimization Program (SIOP), NAVFAC is delivering facilities and infrastructure that will enhance the Navy’s ability to overhaul, repair, and modernize submarines well into the future. (U.S. Navy Photo by DHO Joint Venture Released)
| Date Taken: | 07.03.2025 |
| Date Posted: | 12.17.2025 17:08 |
| Photo ID: | 9449674 |
| VIRIN: | 250228-N-QE566-9008 |
| Resolution: | 6000x4000 |
| Size: | 5.29 MB |
| Location: | US |
| Web Views: | 35 |
| Downloads: | 5 |
This work, Kauai Keel Pour [Image 27 of 27], by Corwin Colbert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.