Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Locked In: Airmen Complete Critical Arresting System Maintenance [Image 13 of 16]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Locked In: Airmen Complete Critical Arresting System Maintenance

    (UNDISCLOSED LOCATION)

    07.07.2025

    Photo by Senior Airman Amanda Jett 

    United States Air Forces Central           

    U.S. Airman 1st Class Christopher Earnest, 379th Expeditionary Civil Engineer Squadron heating, ventilation and air conditioning specialist, holds an arresting system in place during an overhaul within the U.S. Central Command area of responsibility, July 7, 2025. The overhaul required Airmen from multiple sections of the 379th ECES, including barrier maintenance, heavy equipment and structures, to synchronize their efforts. (U.S. Air Force photo by Senior Airman Amanda Jett)

    IMAGE INFO

    Date Taken: 07.07.2025
    Date Posted: 09.26.2025 07:22
    Photo ID: 9341349
    VIRIN: 250707-F-PU288-1262
    Resolution: 8256x5504
    Size: 5.84 MB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 5
    Downloads: 0

    PUBLIC DOMAIN