U.S. Airman 1st Class Christopher Earnest, 379th Expeditionary Civil Engineer Squadron heating, ventilation and air conditioning specialist, holds an arresting system in place during an overhaul within the U.S. Central Command area of responsibility, July 7, 2025. The overhaul required Airmen from multiple sections of the 379th ECES, including barrier maintenance, heavy equipment and structures, to synchronize their efforts. (U.S. Air Force photo by Senior Airman Amanda Jett)
Date Taken: | 07.07.2025 |
Date Posted: | 09.26.2025 07:22 |
Photo ID: | 9341349 |
VIRIN: | 250707-F-PU288-1262 |
Resolution: | 8256x5504 |
Size: | 5.84 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 5 |
Downloads: | 0 |
This work, Locked In: Airmen Complete Critical Arresting System Maintenance [Image 16 of 16], by SrA Amanda Jett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.