Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Locked In: Airmen Complete Critical Arresting System Maintenance [Image 12 of 16]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Locked In: Airmen Complete Critical Arresting System Maintenance

    (UNDISCLOSED LOCATION)

    07.07.2025

    Photo by Senior Airman Amanda Jett 

    United States Air Forces Central           

    U.S. Air Force Tech. Sgt. Kris Pfenning, 379th Expeditionary Civil Engineer Squadron barrier maintenance section chief, applies epoxy during the final night of an arresting system overhaul within the U.S. Central Command area of responsibility, July 7, 2025. The final night of work prepared the arresting system for an upcoming certification event that will evaluate its efficiency and operational readiness. (U.S. Air Force photo by Senior Airman Amanda Jett)

    IMAGE INFO

    Date Taken: 07.07.2025
    Date Posted: 09.26.2025 07:22
    Photo ID: 9341348
    VIRIN: 250707-F-PU288-1248
    Resolution: 8256x5504
    Size: 11.82 MB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 4
    Downloads: 0

    PUBLIC DOMAIN