Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Locked In: Airmen Complete Critical Arresting System Maintenance [Image 11 of 16]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Locked In: Airmen Complete Critical Arresting System Maintenance

    (UNDISCLOSED LOCATION)

    07.07.2025

    Photo by Senior Airman Amanda Jett 

    United States Air Forces Central           

    U.S. Air Force Staff Sgt. Cole Flesh, 379th Expeditionary Civil Engineer Squadron pavement and equipment operator, directs a cane during the final night of an overhaul within the U.S. Central Command area of responsibility, July 7, 2025. The arresting system overhaul required coordination across multiple 379th ECES sections to disassemble, inspect, rebuild and synchronize the safety system. (U.S. Air Force photo by Senior Airman Amanda Jett)

    IMAGE INFO

    Date Taken: 07.07.2025
    Date Posted: 09.26.2025 07:22
    Photo ID: 9341347
    VIRIN: 250707-F-PU288-1117
    Resolution: 7774x4889
    Size: 4.89 MB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 5
    Downloads: 0

    PUBLIC DOMAIN