U.S. Airmen assigned to the 379th Expeditionary Civil Engineer Squadron observe the placement of an arresting system during the final night of an overhaul within the U.S. Central Command area of responsibility, July 7, 2025. The overhaul required coordination across multiple 379th ECES sections to disassemble, inspect, rebuild and synchronize the safety system. (U.S. Air Force photo by Senior Airman Amanda Jett)
Date Taken: | 07.07.2025 |
Date Posted: | 09.26.2025 07:22 |
Photo ID: | 9341346 |
VIRIN: | 250707-F-PU288-1084 |
Resolution: | 7218x4620 |
Size: | 6.04 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 4 |
Downloads: | 0 |
This work, Locked In: Airmen Complete Critical Arresting System Maintenance [Image 16 of 16], by SrA Amanda Jett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.