U.S. Airmen assigned to the 379th Expeditionary Civil Engineer Squadron prepare for the final night of an arresting system overhaul within the U.S. Central Command area of responsibility, July 7, 2025. The final night of work prepared the system for an upcoming certification event that will evaluate its efficiency and operational readiness. (U.S. Air Force photo by Senior Airman Amanda Jett)
Date Taken: | 07.07.2025 |
Date Posted: | 09.26.2025 07:22 |
Photo ID: | 9341345 |
VIRIN: | 250707-F-PU288-1004 |
Resolution: | 8256x5504 |
Size: | 6.74 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 3 |
Downloads: | 0 |
This work, Locked In: Airmen Complete Critical Arresting System Maintenance [Image 16 of 16], by SrA Amanda Jett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.