A crane carries a 10-ton load as contractors end a load test, where a foundation pile successfully resisted a pressure of 225 tons, on Chièvres Air Base, Belgium, Aug. 28, 2022. (U.S. Army photo by Pascal Demeuldre)
Date Taken: | 08.28.2022 |
Date Posted: | 09.21.2022 04:41 |
Photo ID: | 7426895 |
VIRIN: | 220828-A-RX599-1020 |
Resolution: | 7904x5269 |
Size: | 5.31 MB |
Location: | CHIèVRES, HAINAUT (WAL), BE |
Web Views: | 4 |
Downloads: | 3 |
This work, Chièvres Water Infrastructure Works: Successful Load Test for Foundation Piles [Image 10 of 10], by Pascal Demeuldre, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.