Responders install gates to the Environmental Protection Barrier (EPB) around the Golden Ray wreck site. The EPB is a 1-mile custom designed barrier made of high density polyethylene pipe, 5-foot square mesh debris netting and ocean boom coupled to pilings and able to rise and fall with tidal action. The EPB is a part of a multi-layer environmental protection system. Georgia Department of Natural Resources, Coastal Resources Division photo by Tyler Jones.
Date Taken: | 10.30.2020 |
Date Posted: | 10.31.2020 09:54 |
Photo ID: | 6409360 |
VIRIN: | 201030-G-SF967-164 |
Resolution: | 6000x4000 |
Size: | 10.59 MB |
Location: | BRUNSWICK, GA, US |
Web Views: | 207 |
Downloads: | 13 |
This work, Responders install gates to the Environmental Protection Barrier [Image 5 of 5], by PO2 Michael Himes, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT