(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Task Force Power Restoration [Image 5 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows post-hurricane or storm damage recovery in what appears to be a tropical residential area. A blue FEMA-style tarp covers a damaged roof in the foreground, with red markings/text visible on it. Trees show significant storm damage with stripped bark and broken branches, while a worker in a hard hat is visible in the background on elevated infrastructure.

    CAYEY, PUERTO RICO

    01.24.2018

    Photo by Preston Chasteen 

    U.S. Army Corps of Engineers, Tulsa District

    A power worker with the U.S. Army Corps of Engineers (USACE) contractor "Power Secure" rises above the tree limbs to reconnect power lines near the town of Lares, Puerto Rico, Jan. 24, 2018. An estimated 80 percent of the power grid in Puerto Rico was destroyed by Hurricane Maria, in September 2017. FEMA assigned the United States Army Corps of Engineers to the lead the federal effort to repair the hurricane-damaged electrical power grid in support of the Government of Puerto Rico. (photo by Preston L. Chasteen USACE Public Affairs)

    IMAGE INFO

    Date Taken: 01.24.2018
    Date Posted: 01.25.2018 09:54
    Photo ID: 4097847
    VIRIN: 180124-A-IF821-003
    Resolution: 1500x1200
    Size: 1.73 MB
    Location: CAYEY, PR

    Web Views: 39
    Downloads: 10

    PUBLIC DOMAIN