Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Task Force Power Restoration [Image 3 of 7]

    Task Force Power Restoration

    LARES, PUERTO RICO

    01.24.2018

    Photo by Preston Chasteen 

    U.S. Army Corps of Engineers, Tulsa District

    Despite the rugged terrain, power workers with the U.S. Army Corps of Engineers (USACE) contractor "Power Secure" reconnect power lines near the town of Lares, Puerto Rico, Jan. 24, 2018. An estimated 80 percent of the power grid in Puerto Rico was destroyed by Hurricane Maria, in September 2017. FEMA assigned the United States Army Corps of Engineers to the lead the federal effort to repair the hurricane-damaged electrical power grid in support of the Government of Puerto Rico. (photo by Preston L. Chasteen USACE Public Affairs)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.24.2018
    Date Posted: 01.25.2018 09:54
    Photo ID: 4097840
    VIRIN: 180124-A-IF821-001
    Resolution: 1500x1200
    Size: 1.4 MB
    Location: LARES, PR

    Web Views: 115
    Downloads: 20

    PUBLIC DOMAIN