(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Task Force Power Restoration [Image 4 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Utility workers are performing electrical line maintenance or repair work on a power pole using multiple bucket trucks. Two workers on the ground in high-visibility vests and hard hats are coordinating with at least two workers elevated in aerial lift buckets. The scene suggests active power line restoration or installation work, with both a white ETI bucket truck and a yellow Altec aerial lift deployed simultaneously.

    CAYEY, PUERTO RICO

    01.24.2018

    Photo by Preston Chasteen 

    U.S. Army Corps of Engineers, Tulsa District

    Despite the rugged terrain, power workers with the U.S. Army Corps of Engineers (USACE) contractor "Power Secure" reconnect power lines near the town of Lares, Puerto Rico, Jan. 24, 2018. An estimated 80 percent of the power grid in Puerto Rico was destroyed by Hurricane Maria, in September 2017. FEMA assigned the United States Army Corps of Engineers to the lead the federal effort to repair the hurricane-damaged electrical power grid in support of the Government of Puerto Rico.

    IMAGE INFO

    Date Taken: 01.24.2018
    Date Posted: 01.25.2018 09:54
    Photo ID: 4097843
    VIRIN: 180124-A-IF821-002
    Resolution: 1800x1200
    Size: 1.33 MB
    Location: CAYEY, PR

    Web Views: 87
    Downloads: 18

    PUBLIC DOMAIN