Contractors use multiple excavators with straps to carefully guide a section of new Flexsteel pipe into a trench near Defense Fuel Support Point Tampa. Due to the pipe's rigidity, heavy machinery is required to manipulate the continuous lengths and position them for installation without causing damage. (DLA Energy photo courtesy of John Sprenkle)
| Date Taken: | 04.27.2026 |
| Date Posted: | 04.27.2026 12:31 |
| Photo ID: | 9642475 |
| VIRIN: | 260427-A-SO478-7466 |
| Resolution: | 936x1238 |
| Size: | 394.16 KB |
| Location: | FORT BELVOIR, VIRGINIA, US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, New DLA Energy pipeline fortifies fuel readiness at MacDill [Image 11 of 11], by Stephanie Abdullah, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.