(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New DLA Energy pipeline fortifies fuel readiness at Mac Dill [Image 7 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    New DLA Energy pipeline fortifies fuel readiness at Mac Dill

    FORT BELVOIR, VIRGINIA, UNITED STATES

    04.27.2026

    Photo by Stephanie Abdullah 

    Defense Logistics Agency Energy

    Specialized deployment equipment, including a motorized turntable, unwinds a spool of Flexsteel pipe in a controlled manner during the fuel pipeline replacement project near Defense Fuel Support Point Tampa. This method allows for the steady and safe installation of the continuous pipe. (DLA Energy photo courtesy of John Sprenkle)

    IMAGE INFO

    Date Taken: 04.27.2026
    Date Posted: 04.27.2026 12:31
    Photo ID: 9642453
    VIRIN: 260427-A-SO478-7616
    Resolution: 624x822
    Size: 229.8 KB
    Location: FORT BELVOIR, VIRGINIA, US

    Web Views: 4
    Downloads: 0

    PUBLIC DOMAIN