Specialized deployment equipment, including a motorized turntable, unwinds a spool of Flexsteel pipe in a controlled manner during the fuel pipeline replacement project at Defense Fuel Support Point Tampa, Florida. This method allows for the steady and safe installation of the continuous pipe. (DLA Energy photo courtesy of Ronnie Brock)
| Date Taken: | 04.27.2026 |
| Date Posted: | 04.27.2026 12:31 |
| Photo ID: | 9642326 |
| VIRIN: | 260427-A-SO478-9263 |
| Resolution: | 640x480 |
| Size: | 101.67 KB |
| Location: | FORT BELVOIR, VIRGINIA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, New DLA Energy pipeline fortifies fuel readiness at MacDill [Image 11 of 11], by Stephanie Abdullah, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.