Two new 8-inch Flexsteel pipelines are shown in a trench during the DLA Energy fuel line upgrade project near MacDill Air Force Base. This section of the pipeline runs to a new valve pit, forming a critical part of the modernized fuel receipt system. (DLA Energy photo courtesy of Ronnie Brock)
| Date Taken: | 04.27.2026 |
| Date Posted: | 04.27.2026 12:31 |
| Photo ID: | 9642349 |
| VIRIN: | 260427-A-SO478-6025 |
| Resolution: | 600x800 |
| Size: | 200.52 KB |
| Location: | FORT BELVOIR, VIRGINIA, US |
| Web Views: | 5 |
| Downloads: | 0 |
This work, New DLA Energy pipeline fortifies fuel readiness at Mac Dill [Image 11 of 11], by Stephanie Abdullah, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.