Dry Dock 5 (DD5) construction progresses at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility as part of the Shipyard Infrastructure Optimization Program (SIOP). OICC PHNSY executes Naval Facilities Engineering Systems Command (NAVFAC) mission to deliver facilities and infrastructure through SIOP, enhancing the Navy’s ability to overhaul, repair and modernize submarines and support current and future classes of nuclear-powered warships. (U.S. Navy photo by Corwin Colbert)**
| Date Taken: | 03.30.2026 |
| Date Posted: | 04.02.2026 21:08 |
| Photo ID: | 9597010 |
| VIRIN: | 260330-N-QE566-1019 |
| Resolution: | 1731x1155 |
| Size: | 818.27 KB |
| Location: | US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, DD5 Progress [Image 32 of 32], by Corwin Colbert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.