Contractors work on Dike 3 construction site around Folsom Lake on Sept. 11, 2025. As part of the Folsom Dam Raise Project, a new 1,600-foot embankment dike, Dike 3, is being constructed 80 feet upstream of the existing dike. (U.S. Army photo by Samantha Boyle).
| Date Taken: | 09.11.2025 |
| Date Posted: | 12.31.2025 13:20 |
| Photo ID: | 9465685 |
| VIRIN: | 250911-A-VR800-5983 |
| Resolution: | 6000x4000 |
| Size: | 5.14 MB |
| Location: | CALIFORNIA, US |
| Web Views: | 1 |
| Downloads: | 1 |
This work, Work Underway at Dike 3 [Image 4 of 4], by Samantha Boyle, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.