Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cumberland river hydropower rehabilitation project moves toward key milestones [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Cumberland river hydropower rehabilitation project moves toward key milestones

    NASHVILLE, TENNESSEE, UNITED STATES

    09.03.2025

    Photo by Noe Gonzalez 

    U.S. Army Corps of Engineers, Nashville District

    Andritz contractors lower a massive rotor to be set aside, making way for the installation of a new turbine as part of the turbine generator rehabilitation project at Old Hickory Powerhouse on the Cumberland River. The rotor weighs 504,000 pounds. Sept. 3, 2025.

    IMAGE INFO

    Date Taken: 09.03.2025
    Date Posted: 11.19.2025 12:42
    Photo ID: 9397686
    VIRIN: 250903-A-LQ420-7527
    Resolution: 7008x4672
    Size: 9.61 MB
    Location: NASHVILLE, TENNESSEE, US
    Hometown: NASHVILLE, TENNESSEE, US

    Web Views: 2
    Downloads: 0

    PUBLIC DOMAIN