Andritz contractors overseeing bridge crane operation as a massive rotor is carefully moved toward them during the turbine generator rehabilitation project at Old Hickory Powerhouse on the Cumberland River. The rotor, weighing 504,000 pounds, is part of the ongoing effort to replace turbine components. Sept. 3, 2025.
| Date Taken: | 09.03.2025 |
| Date Posted: | 11.19.2025 12:42 |
| Photo ID: | 9397682 |
| VIRIN: | 250903-A-LQ420-8934 |
| Resolution: | 7008x4672 |
| Size: | 7.2 MB |
| Location: | NASHVILLE, TENNESSEE, US |
| Hometown: | NASHVILLE, TENNESSEE, US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, Cumberland river hydropower rehabilitation project moves toward key milestones [Image 5 of 5], by Noe Gonzalez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.