Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cumberland river hydropower rehabilitation project moves toward key milestones [Image 1 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Cumberland river hydropower rehabilitation project moves toward key milestones

    NASHVILLE, TENNESSEE, UNITED STATES

    09.03.2025

    Photo by Noe Gonzalez 

    U.S. Army Corps of Engineers, Nashville District

    Andritz contractors overseeing bridge crane operation as a massive rotor is carefully moved toward them during the turbine generator rehabilitation project at Old Hickory Powerhouse on the Cumberland River. The rotor, weighing 504,000 pounds, is part of the ongoing effort to replace turbine components. Sept. 3, 2025.

    IMAGE INFO

    Date Taken: 09.03.2025
    Date Posted: 11.19.2025 12:42
    Photo ID: 9397682
    VIRIN: 250903-A-LQ420-8934
    Resolution: 7008x4672
    Size: 7.2 MB
    Location: NASHVILLE, TENNESSEE, US
    Hometown: NASHVILLE, TENNESSEE, US

    Web Views: 2
    Downloads: 0

    PUBLIC DOMAIN