Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cumberland river hydropower rehabilitation project moves toward key milestones [Image 2 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Cumberland river hydropower rehabilitation project moves toward key milestones

    NASHVILLE, TENNESSEE, UNITED STATES

    09.03.2025

    Photo by Noe Gonzalez 

    U.S. Army Corps of Engineers, Nashville District

    The U.S. Army Corps of Engineers, Nashville District, and Andritz contractors carefully disassemble a massive rotor from one of the hydropower units at Old Hickory Powerhouse on the Cumberland River as part of the ongoing turbine generator rehabilitation project. The rotor weighs 504,000 pounds and is set aside to make way for the installation of a new turbine. Sept. 3, 2025.

    IMAGE INFO

    Date Taken: 09.03.2025
    Date Posted: 11.19.2025 12:42
    Photo ID: 9397684
    VIRIN: 250903-A-LQ420-5475
    Resolution: 7008x4672
    Size: 9.44 MB
    Location: NASHVILLE, TENNESSEE, US
    Hometown: NASHVILLE, TENNESSEE, US

    Web Views: 2
    Downloads: 0

    PUBLIC DOMAIN