Team members discuss potential failure modes during a periodic assessment of the Branched Oak Dam inside the U.S. Army Corps of Engineers, Omaha District headquarters June 3, 2025. A periodic inspection of the dam is conducted every five years, and a periodic assessment is conducted every 10 years to identify potential defects and to ensure the dam is functioning as designed. The dam is one of 10 Salt Creek dams that work together to reduce flood risk for the city of Lincoln and surrounding communities. (U.S. Army Corps of Engineers photo by Delanie Stafford)
Date Taken: | 06.02.2025 |
Date Posted: | 06.06.2025 14:49 |
Photo ID: | 9090125 |
VIRIN: | 250602-A-KS317-1019 |
Resolution: | 3300x2270 |
Size: | 2.49 MB |
Location: | US |
Web Views: | 1 |
Downloads: | 1 |
This work, Omaha District Dam safety inspection season in full swing [Image 20 of 20], by Delanie Stafford, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.